+675 7321 5327

iset.qzero@gmail.com

Risk Engineering KPI Summary (Components 1–5)

Suggested targets — adjust to site standards and regulatory requirements.

ComponentMain TaskKey KPIsSuggested Targets
1 Mine InfrastructurePit & Underground Geotechnical• % TARP triggers closed within SLA
• % geotechnical inspections on time
≥ 95% SLA close-out; 100% inspections
1 Mine InfrastructureTSF Lifecycle (GISTM)• % of 77 GISTM requirements met
• % instrumentation functional; drill frequency
≥ 98% requirements; ≥ 95% instruments; drills per plan
1 ProcessingCrushing/Grinding/CIL-CIP• % critical control verifications on time
• PM compliance %
≥ 95% CCV on-time; ≥ 90% PM
1 UtilitiesPower & Water Systems• HV switching competency %
• Potable water quality compliance %
100% competent; 100% potable compliance
2 Ops & LogisticsDrill & Blast• % blast clearances signed
• Misfire investigation closure rate
100% clearances; 100% misfires closed in SLA
2 Ops & LogisticsLoad & Haul• HME incident rate
• Fatigue breach rate
0 HPIs; ≤ site fatigue threshold
3 Workforce & CommunityCamp & Welfare• Water quality pass %
• Clinic response time; fatigue breach rate
100% water pass; ≤ response SLA; ↓ fatigue trend
3 Workforce & CommunityTraining & Competency• Competency coverage % (by role/risk)
• Overdue training %
≥ 95% coverage; 0% overdue critical
3 StakeholdersCommunity & Landowner Engagement• Grievances closed on time %
• Engagement meetings held vs plan
≥ 95% on-time; ≥ 90% plan adherence
4 CompliancePermits & Reporting (MRA/CEPA/WHS)• On-time statutory submissions %
• Audit action closure %
100% on-time; ≥ 95% closure in SLA
4 HSE SystemsIncident Mgmt & Investigation• CAPA closure on time %
• Repeat incident rate
≥ 95% on-time; ↓ repeats to zero
4 ContractorsContractor/Vendor HSE• Contractor audit score
• PTW compliance %
≥ 90% audit; ≥ 98% PTW
5 EmergencyEmergency Response & Crisis Mgmt• Drill pass rate
• Response time benchmark
≥ 95% pass; ≤ benchmark
5 Asset IntegrityCritical Controls & Reliability• CCV on-time %
• Backlog age; MTBF / MTTR
≥ 95% CCV; ↓ backlog; ↑ MTBF / ↓ MTTR
5 Cyber/OTInformation Security (OT/IT)• Patch compliance %
• Backup recovery test pass %
≥ 95% patched; 100% recovery tests
5 Supply ChainInventory & Critical Spares• Stockout incidents (safety-critical)
• Supplier NCR rate
0 stockouts; ↓ NCR trend

View Courses & Dates